loading

Tailored Camp Solutions to Meet  Custom Needs.

How to make a container house

Nowadays, the application of container houses is becoming more and more extensive, and it has been widely recognized and used with the advantages of strong box structure, easy movement, low cost of use, energy saving and environmental protection. So how exactly are container houses made? What kind of production process can ensure the rigor of the quality of the house? The following Wellcamp manufacturers will introduce to you:

The first step, chassis welding

The steel frame chassis of the container house is first welded with 140*50 channel steel. The chassis and beams of the container house with a size of 3m*6m are all welded with 4.8*2.0 type square steel, with a spacing of 35cm. The 6 columns and the four-sided ring beam of the roof are all welded with 5*5.2.0 square steel.

The second step, splicing color steel plates

The wall panels and roof panels of the container houses china are made of a combination of 50mm thick purification panels, both sides are white, the standard size of the window is 930*1000 sliding windows, using special color steel doors with a size of 930*2000, the chassis is all The building formwork with a thickness of 18mm is selected, and the load-bearing capacity per square meter can reach 200kg.

The third step, laying the floor

After installing the main structure of the house, it is necessary to lay a layer of high-grade floor leather on the floor of the chassis, which is waterproof, beautiful, and easy to clean. It can also be replaced with wooden floors or other material floors according to customer requirements.

The fourth step, install lighting facilities

The lighting of the container house is usually installed in the middle of the house, using a simple ceiling light, the switch is installed next to the door, the socket is installed 60 cm above the ground, and the air conditioning hole is opened diagonally opposite the door.

The fifth step, install the anti-theft net and carry out gap treatment

Finally, install the window anti-theft net, and apply the waterproof glue for the windows, doors and roof panels. The waterproof glue for the roof panel should use the kind of waterproof glue specially used for glass curtain walls, because if ordinary glue is used, it will pass through the sun, wind and rain. It will gradually fall off, and the waterproof performance can only last for half a year. If you use the glass curtain wall waterproof glue, the waterproof time can be extended by 5-6 times.

The above is an introduction to the production method of the container house. It is precisely because of the rigorous production process of the container houses china that the house is guaranteed to be waterproof, moisture-proof, earthquake-resistant, wind-proof and other superior properties, so that it can meet the needs of various environments. application. If you have any questions or needs about container houses, please feel free to consult Wellcamp manufacturers.

Guangdong WELLCAMP BUILDING MATERIALS CO., LTD thinks that customer satisfaction is one of the most important determinants of brand loyalty. High-quality service can be the difference between a one-time buyer and a lifelong repeat customer.

Guangdong WELLCAMP BUILDING MATERIALS CO., LTD also values the time, skills, and expert opinions of our staff. We are committed to providing fair and living wages, reasonable, structured work schedules, and clear duties and spheres of rights and responsibilities for each team member.

Guangdong WELLCAMP BUILDING MATERIALS CO., LTD's core technology of new manufactured homes for sale enables us to understand and utilize in a right way.

comes in a vast array of styles and best manufactured homes depending on which luxury manufactured homesis used.

cheap manufactured homes mobile home manufacturers is slower than modern manufactured homes but has a number of special applications, such as for pre manufactured homes for sale.

GET IN TOUCH WITH Us
recommended articles
Knowledge News BLOG
no data
Customer service
detect