China's economy has entered a stage of high-quality development from a stage of rapid growth. We pay more attention to protecting the ecological environment. In the construction industry, green buildings represented by Chongqing Steel Structure Factory have gained huge development space and momentum. Most landmarks, large super high-rise buildings and modern steel structures use steel as the main material. The application of Chongqing steel structure workshop in China has played an important role in China's economic construction. The development of Chongqing steel structure workshop has promoted the development of the construction industry in China. However, in the safe construction and scientific management of steel structure workshops in Chongqing, due to the fast construction speed, most of the construction work is done outside most of the time, and the multi-channel construction is cross-operated, so special attention must be paid to safety risks. Work. In view of the safe construction management of steel structure workshop, the following points are proposed. 1. Before the construction of the steel structure workshop, the management personnel and on-site construction personnel must make preparations for the construction. First of all, it is necessary to understand the work flow, formulate a scientific safety and quality assurance system, improve the mechanical equipment, and be familiar with the safety technical operating procedures. Managers must develop a series of construction plans and safety technical measures and transfer them to be responsible for the management, implementation and supervision of the entire construction site. 2. Before construction, the engineering department should prepare a construction drawing design plan according to the architectural design drawings of the steel structure workshop. The project overview, construction process, technology, personnel position distribution, mechanical equipment and construction progress are listed. On-site construction personnel must have basic construction drawings and basic safety knowledge, and obtain corresponding work certificates and special operation certificates. Before construction, the design unit and the supervision unit will review the drawings and put forward deviations or problems in the design to ensure smooth construction. 3. Before the construction of the steel structure workshop, the safety inspection of the machinery and equipment involved in the construction should be carried out to ensure that it operates normally, without lack of oil and without sound. For example, it should be done immediately to avoid accidents. operation process. Additionally, the entry of steel must be rigorously inspected and inspected to ensure the parts are intact. If quality problems are found, the material should be rejected. If it can be repaired on site, the manufacturer of the steel structure can repair it. 4. Do a good job in the construction safety training and education of the steel structure workshop, and clarify the details of the company's safety system and civilized construction. Hang safety signs, slogans and warning signs at prominent locations on the construction site to remind site personnel of the importance of safety. Establish an on-site project management system, adhere to daily safety education and summaries, and formulate safety information and pre-class records.
Contact: Siwen Chen
Tel: +86 13902808995
E-mail: siwenchen@chinawellcamp.com
Address: Unit 804, 8th Floor, Block A, 115 Jihua 4th Road, Chancheng District, Foshan City, Guangdong Province, China
Factory Address: No.7 Wende 4th street,Dawang High -Tech Zone, Zhaoqing, Guangdong, China