is not limited by climate and environmental conditions, it is an emerging model of prefabricated building that saves manpower and effectively improves building quality. After modular production in the factory, the boxes are directly transported to the construction site for assembly. The boxes also contain basic furniture, and you can move in at any time after the installation is complete! Today Wellcamp container houses china manufacturer will take you to understand the entire production and on-site construction process of the container house:

1. Factory prefabricated construction project

According to the size of the prefab container house, it is produced and assembled in the factory.

1. Wall production: The production process of the wall is completed on the assembly line, including internal insulation and landfilling of hydraulic water pipes. Add the upper layer to the wall panel where the insulation cotton and adhesive are laid, and one wall is completed. The production process for walls with embedded circuits is basically the same as for walls without embedded circuits. The difference, however, is that the lines are preset within the insulation, and then the upper deck is added.

2. The manufacturing process of exterior wall panels and doors and windows is also produced by the factory.

3. In-factory assembly: hoisting and assembly process of exterior wall panels;

4. The production process of interior interior decoration and assembled furniture can be customized together with the box house.

2. On-site construction part

1. Basic part

The foundation construction can be carried out at the same time as the pre-production of the factory. The foundation of the container house generally uses an independent foundation instead of a large area of u200bu200bland reclamation, so it is more convenient and efficient, saving costs and expenses.

2. Assembly and construction of container house:

Transport the container house to the construction site for assembly, use the connecting structure to connect the four groups of boxes, complete the roofing work of the house, carry out the roof construction after the main body is joined, build the roof with a sloping roof, lay waterproof, asphalt, container houses china construction is complete.

From the above introduction, we can see that the container houses china adopts the mode of prefabrication in the early stage and direct installation on site, and basically does not need any foundation. The whole construction process is very convenient and fast, and the time is much lower than other types. Housing, which greatly saves construction time, so container houses are now widely used in various fields, and have become a new generation of environmentally friendly and economical houses.

Collectively, the effect of mobile home prices on industrial society has been to eliminate best manufactured homes and drastically reduce the time long associated with cheap manufactured homes.

Guangdong WELLCAMP BUILDING MATERIALS CO., LTD strives to reflect the highest ethical standards in our relationships with members, providers, and shareholders.

Choose the right platform for selling mobile home manufacturers and we'll reach the right customers. But if we have the right idea in the wrong platform, that still adds up to the wrong idea.

GET IN TOUCH WITH Us
recommended articles
Knowledge News BLOG
no data
Customer service
detect