As a building with strong industrial style and temporary construction characteristics, container apartment buildings have gradually gained market recognition and favor. How about the application of container house construction in rainy areas? Rainy weather is more frequent in rainy areas. While nourishing the earth, it also brings a lot of inconvenience to people’s lives and work. Many construction workers suffer a lot from their lives and work. Influence. In the event of heavy rain, work can only be suspended for rest, and the progress of the project will be greatly affected. So, will container apartment buildings leak? What should I do in the face of rain leakage? Let’s take a look with the editor below! 1. Will container apartment buildings leak water? Because the general container house buildings are flat Roofs and flat roofs require relatively high waterproofing requirements. At the same time, the influence of thermal expansion and contraction, people on the roof, rain and snow load, and secondary roof decoration on the deformation of the waterproof layer must be considered, resulting in water leakage. The general treatment method is to make a monolithic roof as much as possible, or to ensure that the roof has a slope, so that rainwater cannot be deposited. How should container apartments face rain leakage? Container apartment construction specific waterproof instructions are as follows: Waterproof membrane construction, after cleaning the base layer, brush the adhesive glue on the reverse side of the membrane and the base layer, according to the elastic baseline. Paste, roll, and check the joints afterwards. After completion, a water storage experiment should be done. The paint is waterproof, take one cloth and two paints as an example: after cleaning the base layer, brush the paint completely, after drying to form a film, lay a layer of glass fiber cloth carcass reinforcement, and brush a layer of paint on the flattened surface After fixing and drying, proceed to the next roof waterproof construction. Laying a rigid waterproof layer should be carried out about two days after the completion of a flexible waterproof layer. The basic materials are high-quality fatty acid mortar waterproofing agent, cement, sand, fine stone aggregate, and fiber. The thickness of the waterproof layer should be 20 -30 mm. glass, aluminum plate, color steel plate, etc. cover the top, waterproof and have ventilation and heat insulation effect. The top is equipped with a steel structure keel, covering the waterproof layer of aluminum plate, glass, color steel plate, etc., and it is treated with glue. above, choose to use according to customer requirements and budgeted cost.
As we have known for quite some time, the success of WELLCAMP, WELLCAMP prefab house, WELLCAMP container house in the future will depend greatly on our ability to strike a balance between valuable human insight and interaction with technology.
If you are interested in any of mobile home manufacturers, please feel free to contact us.
Another way to maintain the professional yet engaging innovative technology in pre manufactured homes is by embedding new skills directly on manufacturing.
Contact: Siwen Chen
Tel: +86 13902808995
E-mail: siwenchen@chinawellcamp.com
Address: Unit 804, 8th Floor, Block A, 115 Jihua 4th Road, Chancheng District, Foshan City, Guangdong Province, China
Factory Address: No.7 Wende 4th street,Dawang High -Tech Zone, Zhaoqing, Guangdong, China